İkinokta is a mechatronics engineering company operating in the fields of Automation Systems, Manufacturing Machine Engineering and Design, and Low and High Voltage Current Systems. Through our project-based solutions encompassing Field Trip, Analysis, Design, Proposal, Production, Assembly, Project Commissioning, and After Sales Support services, we provide comprehensive engineering services to our clients. Founded in 2004 with the mission of being a pioneer engineering company in its field in Turkey, İkinokta has developed long-term and strong partnerships in the industry by placing great importance on the principles of "Quality and Trust".

Learn More

Projects

Medical Waste Management Factory - Bursa

Medical Waste Management Factory - Bursa

MEDICAL WASTE MANAGEMENT FACTORY
Bursa

Our company provided comprehensive engineering and technical support services for the Medical Waste Management Factory in Bursa. The scope of the project included the following works to ensure reliable and efficient operations:

Mechanical Design & Automation:

Customized mechanical designs and automation solutions were developed to optimize production processes and enhance operational efficiency.

Low-Voltage Electrical Systems:

Installation and commissioning of low-voltage systems were carried out to support the facility's energy infrastructure.

High-Voltage Electrical Systems:

High-voltage infrastructure was designed and implemented for efficient power transmission and distribution.

Assembly Services:

Professional assembly of the equipment and systems used in the project was completed.

After-Sales Support:

Comprehensive technical support services were provided to ensure the facility operates sustainably and without interruptions.

These efforts were undertaken to support the factory's sustainability and operational success goals.

Medical Waste Management Factory - Elazığ

Medical Waste Management Factory - Elazığ

MEDICAL WASTE MANAGEMENT FACTORY
Elazığ

Our company provided comprehensive engineering and technical support services for the Medical Waste Management Factory in Elazığ. The scope of the project included the following works to ensure efficient and safe operations:

Automation Systems:

Advanced automation solutions were integrated to optimize production processes and ensure seamless control.

Low-Voltage Electrical Systems:

Installation and commissioning of low-voltage systems were carried out to meet the facility's energy requirements.

High-Voltage Electrical Systems:

High-voltage infrastructure was designed and implemented for efficient power transmission and distribution.

Assembly Services:

Professional assembly of the equipment and systems used in the project was completed.

After-Sales Support:

Comprehensive technical support services were provided to ensure the facility operates continuously and efficiently after the project completion.

These efforts were undertaken to guarantee the factory's sustainability and operational efficiency.

Medical Waste Facility - 1915 Çanakkale Bridge

Medical Waste Facility - 1915 Çanakkale Bridge

MEDICAL WASTE FACILITY
1915 Çanakkale Bridge

As experts in the field, our company installed the modular expansion joints on the steel deck side of the 1915 Çanakkale Bridge. This particular bridge is the longest-span suspension bridge globally, spanning an impressive 2023 meters. The modular expansion joints we installed are remarkable for their size and are the largest expansion joints ever manufactured by Maurer AG.

Installation Details:

The installation involved carefully placing modular expansion joints weighing 63 tons. We utilized a mobile crane with a remarkable lifting capacity of 400 tons to accomplish this task.

Welding Operations:

Once the placement was complete, a cover plate was placed, followed by the commencement of welding operations. Our company used 2.5 tons of welding wire during these works.

Securing Process:

To secure the joint and coating plate, we employed a joining process that utilized bolts, ensuring their sturdy attachment to the bridge deck.

This project represents a significant achievement in bridge engineering and demonstrates our company's expertise in handling large-scale infrastructure projects.

Medical Waste Facility

Medical Waste Facility

MEDICAL WASTE FACILITY

As experts in the field, our company installed modular expansion joints on the steel deck side of the 1915 Çanakkale Bridge. This particular bridge is the longest-span suspension bridge globally, spanning an impressive 2023 meters. The modular expansion joints we installed are remarkable for their size and are the largest expansion joints ever manufactured by Maurer AG.

The installation involved carefully placing modular expansion joints weighing 63 tons. We utilized a mobile crane with a remarkable lifting capacity of 400 tons to accomplish this task. Once the placement was complete, a cover plate was placed, followed by the commencement of welding operations. Our company used 2.5 tons of welding wire during these works. To secure the joint and coating plate, we employed a joining process that utilized bolts, ensuring their sturdy attachment to the bridge deck.

ZAED Machines Museum - Abu Dhabi

ZAED Machines Museum - Abu Dhabi

ZAED MACHINES MUSEUM
Abu Dhabi

As experts in the field, our company installed modular expansion joints on the steel deck side of the 1915 Çanakkale Bridge. This particular bridge is the longest-span suspension bridge globally, spanning an impressive 2023 meters. The modular expansion joints we installed are remarkable for their size and are the largest expansion joints ever manufactured by Maurer AG.

The installation involved carefully placing modular expansion joints weighing 63 tons. We utilized a mobile crane with a remarkable lifting capacity of 400 tons to accomplish this task. Once the placement was complete, a cover plate was placed, followed by the commencement of welding operations. Our company used 2.5 tons of welding wire during these works. To secure the joint and coating plate, we employed a joining process that utilized bolts, ensuring their sturdy attachment to the bridge deck.

ZAED Machines Museum - Abu Dhabi

ZAED Machines Museum - Abu Dhabi

ZAED MACHINES MUSEUM
Abu Dhabi

As experts in the field, our company installed modular expansion joints on the steel deck side of the 1915 Çanakkale Bridge. This particular bridge is the longest-span suspension bridge globally, spanning an impressive 2023 meters. The modular expansion joints we installed are remarkable for their size and are the largest expansion joints ever manufactured by Maurer AG.

The installation involved carefully placing modular expansion joints weighing 63 tons. We utilized a mobile crane with a remarkable lifting capacity of 400 tons to accomplish this task. Once the placement was complete, a cover plate was placed, followed by the commencement of welding operations. Our company used 2.5 tons of welding wire during these works. To secure the joint and coating plate, we employed a joining process that utilized bolts, ensuring their sturdy attachment to the bridge deck.

1915 Çanakkale Bridge Expansion Joint Installation

1915 Çanakkale Bridge Expansion Joint Installation

1915 ÇANAKKALE
BRIDGE EXPANSION JOINT INSTALLATION

As experts in the field, our company installed modular expansion joints on the steel deck side of the 1915 Çanakkale Bridge. This particular bridge is the longest-span suspension bridge globally, spanning an impressive 2023 meters. The modular expansion joints we installed are remarkable for their size and are the largest expansion joints ever manufactured by Maurer AG.

The installation involved carefully placing modular expansion joints weighing 63 tons. We utilized a mobile crane with a remarkable lifting capacity of 400 tons to accomplish this task. Once the placement was complete, a cover plate was placed, followed by the commencement of welding operations. Our company used 2.5 tons of welding wire during these works. To secure the joint and coating plate, we employed a joining process that utilized bolts, ensuring their sturdy attachment to the bridge deck.

1915 Çanakkale Bridge Expansion Joint Installation

1915 Çanakkale Bridge Expansion Joint Installation

1915 ÇANAKKALE
BRIDGE EXPANSION JOINT INSTALLATION

As experts in the field, our company installed modular expansion joints on the steel deck side of the 1915 Çanakkale Bridge. This particular bridge is the longest-span suspension bridge globally, spanning an impressive 2023 meters. The modular expansion joints we installed are remarkable for their size and are the largest expansion joints ever manufactured by Maurer AG.

The installation involved carefully placing modular expansion joints weighing 63 tons. We utilized a mobile crane with a remarkable lifting capacity of 400 tons to accomplish this task. Once the placement was complete, a cover plate was placed, followed by the commencement of welding operations. Our company used 2.5 tons of welding wire during these works. To secure the joint and coating plate, we employed a joining process that utilized bolts, ensuring their sturdy attachment to the bridge deck.

Get In Touch

Headquarters

Emniyet Evler Mahallesi Eski Büyükdere St. Sapphire Sitesi No:1/1 Kağıthane İstanbul

R&D & Warehouse :

Paşaalanı Mahallesi Sanayi 4.Kapı 45. Sokak 18/1
Phone : +90 533 217 04 56

destek@ikinoktamuhendislik.com

Portfolio